The appointment includes for the design, construction supervision and completion of contract documentation for approximately 17km of dual 3 lane and dual 2 lane carriageway with 16 bridges, 2 No. Grade Separated Interchanges, Upgrading of the existing M50/N2 Interchange, tolling facilities including buildings and infrastructure. As part of the commission there is also approximately 6.5km of dual 2 lane carriageway link roads and side road realignment.
The project is a Design and Build commission in association with Jons/Sisk Joint Venture to construct a new dual carriageway from the N2/M50 Interchange to a new junction on the existing N2 North of Ashbourne, bypassing Ashbourne en route.